Application
QIC EVOLUTION SG Single glazed flush look 3 part base track has been designed to sleekly compliment the QIC EVOLUTION partition system. Designed with single to double transition in mind, the base track height marries into the flush look on the single glaze track along-side single glaze and double glaze door frames, from both inside and out-side the office environment, visually this gives a flush wall of glass look at the base detail.
Delivery
We utilise either our own fleet of vehicles or external couriers for delivery to your project. We aim to deliver next day, stock prevailing, and we receive the order prior to midday. Standard delivery for stock products is £ 30.00 to UK mainland.
Packed in quantities as ordered with no bundle exceeding 25kgs. Packaging is by heavy gauge heat shrink polythene with corrugated cardboard end protection
Technical Details
QIC EVOLUTION SG – Single glazed flush look 3 part base track is part of an acoustic tested system providing up to 35dB (Rw) when being used in conjunction with the stated door frame ( SGDF ) and head /abutment track ( SG03 ) plus all the relevant component gaskets (SG03-PVC) glass clip in, (SG01-4/5BG) track base gasket and (SGDF-BLKG) door rebate gasket parts. Glass scenarios are 12mm toughened & 12.8mm laminated & 10.8 & 12.8mm with glass dry joints. See test evidence for further details.
QIC EVOLUTION SG – Single glaze flush look 3 part base track, has x2 areas for gasket installation, 5mm glazing rod is used, and then either 4mm or 5mm rod is used on the outer clip in profiles dependant on glass thickness installed.
Fitting of the track securely to a solid floor surface is recommended and cleats used in the base on runs with more than one length will be required for flush transition. Glass insulation requires packers to assist with shuffle glazing, head track gaskets are to be lubricated prior to fitting panels. ( particularly on 12/12.8mm glass as these are a tighter fit ).
This system is currently not fire rated.